I am ready to install new equipment in our plant. How do I find my local Hardy Representative for application assistance and to get current prices and availability?
We are doing a Loss in weight system with a Hardy Controller and 4 Hardy load cells. My question is, when we first turn on the system and have our equipment on the load cells but empty of material and ready to be filled, would I enter a reference weight of 0.00 at this time for the C2® calibration or do I need to know the weight of our equipment?